Ordering concrete used to mean phoning three or four suppliers, chasing quotes and waiting days for a slot. With Same Day Concrete you can do it all online in under a minute — 24 hours a day, 7 days a week.
Step 1: Work out how much concrete you need
Concrete is sold by the cubic metre (m³). Use our free concrete calculator for slabs, footings, pads and columns, or read our how much concrete do I need guide.
Remember: with volumetric concrete you don’t have to be exact. Give your best estimate — we’ll keep mixing until the job’s done and you’ll only pay for what you actually use.
Step 2: Choose your concrete grade
Pick from GEN, C, PAV or specialist grades. Not sure which you need? See our concrete grades explained guide. Most domestic jobs use C25–C35.
Step 3: Get an instant quote
Head to our quote page, enter your postcode, volume and grade. You’ll see the price ex-VAT plus delivery, VAT and total in real time.
Current pricing (2026): C35 at £120/m³ ex-VAT plus £60 delivery. Full breakdown on our concrete prices page.
Step 4: Book online
Click Book Online, pick your date and delivery window, and pay a 10% deposit by card via Stripe. That secures your slot.
Step 5: Track your driver
On delivery day you’ll receive an SMS with a live tracking link. You’ll see exactly where your driver is and when they’ll arrive — no more waiting around all day.
Step 6: Pour and pay
The driver mixes the concrete fresh on-site to your grade. Once your pour is done, we measure exactly how much was used and settle the balance — card on the truck or invoice for trade accounts.
Ready to order?
Get your instant quote or call 01924 910 128. Same-day delivery available across the whole of Yorkshire.
FAQs
Can I order concrete online for same-day delivery?+
Yes. Same Day Concrete accepts online orders 24/7. Book before 10am for same-day delivery (subject to availability) across most of Yorkshire.
How much notice do I need to give?+
Same-day is often possible if ordered before 10am. Next-day delivery is guaranteed with any booking. For large or scheduled jobs, book 2–3 days ahead.
Do I need to pay upfront?+
A 10% deposit is taken via Stripe when you book. The remaining 90% is due on delivery — payable by card on the truck or invoice for trade accounts.
What if I need less than I ordered?+
With volumetric concrete you pay only for what you use. If you ordered 3m³ but only used 2.5m³, you’re billed for 2.5m³ and the deposit is adjusted accordingly.

